ISO/IEC FDIS 29110-5-6-3 · stage 50.00Planning date 18 Feb 2027, our estimateOfficial record
ISO
29110
ISO 29110 Revision CheckerThe Intermediate profile, before publication

Home / Changelog

Every change, dated

The changelog

A change to the record changes the pages, the check and the kit. This page lists the changes so a reader can see what moved and when.

01Changes

The record and the site

Changes, newest first
DateWhat changedWhy
2026-10-22First publication of the recordThe public ISO record was read and the 40-practice register was written from it and the published structure of the series.
2026-10-22Free check, kit and watch publishedThe check, the register, the kit and the watch are the offer described on the home page.
02What a change looks like

The record hash

The record carries a hash of its content. When a field changes, the hash changes and the refresh script reports the field that moved. A reader who keeps a copy of a page can compare its date with this page and with the sitemap.

The current record hash begins 11b52ed14dcd3c28. It is not a security control; it is a way to catch a silent edit.

The publication record The change watch