Evidence to keep
- System Definition and RealisationThe design record for each element
- System Definition and RealisationThe realisation record showing what was built or bought
- System Definition and RealisationThe deviation log where the build differs from the design
Questions before you sign
- Which element carries the most design risk?
- Does the built thing match the design record?
- Where did we deviate, and who approved it?
The practice, in our words
Design each element to its allocated requirements, build or acquire it, and record the design and the realisation. The evidence is not the drawing alone; it is the drawing, the decision and the built thing that matches them.
What it means in a VSE
Keep the design record at the level the element needs. For a bought element, the design record is the supplier's specification plus the acceptance evidence, not a copy of their drawings.
In a firm of 25 people or fewer, design and realise the elements has to earn its time. The test for SR-04 is not whether the team understands it but whether the artefact exists at the end of the project. Shrink the meeting. Shrink the document. Keep the record.
How to evidence it
Attach the artefacts above to the Design and realise the elements row with the project name, the owner and the date. The anchor for SR-04 is The design record for each element. A named person must produce it on request.
For SR-04, the reviewer will sample one live decision and ask for The realisation record showing what was built or bought. No artefact, no evidence. A file that depends on one person's mailbox is not a file for design and realise the elements.
What an assessor samples
An assessor reads the design and realise the elements practice, asks for its evidence and tests one project against it. For SR-04, the useful sample is the most recent project that used the practice, not the best one. A reconstruction written for the visit is a finding for SR-04 if the practice cannot be shown to have happened when it mattered.
Common gaps
- Design documents that stop at the last review and never match the build
- A bought element with no specification on file
Where the draft fits
The public abstract places design and realise the elements inside one of the four processes the Intermediate profile covers. For SR-04, the draft clause numbering and wording are not public, so this page cites Public abstract, process list and does not quote the draft. The basis label for SR-04 says whether the practice is stated in the public record, named as a process in the series, or our reading.